ISO Ceritified
ISO 9001:2015
Quality & Safety
Highest Standards
Delivery
24hr Operations
Contact Us

Refurbishment of Offshore Landing Structure

Phase 1 - Removal of Damaged Structure

Structure was safely dismantled with precision and care to ensure minimal disruption to ongoing operations. 

Our Fabric Maintenance and Marine Team safely removed the structure and transported it by to our LRQA Certified Fabrication Shop for repairs. 

Phase 2 - Refurbishment

Our highly experience team of welders and fabricators were able to upgrade and reinforcing the landing to meet the latest safety and operational standards, ensuring longevity and reliability.

Landing was quote with industrial standard high quality PPG Marine & Protective coatings.  

Phase 3 - Installation

Landing structure was safely moved from our Guapo facility in Point Fortin and loaded on to our Marine Vessel for transportation and installation. 

Positioning of Landing structure onto Rig was done by our Marine Utility Vessel the Sea Dolphin. This job was executed efficiently and safely by our highly experienced Marine Team. 

Our Fabrication and Marine Team show dedication to precision, safety, and efficiency in this installation resulting in zero incidents occurring.  

 

Trinidad & Tobago

Trinidad Facility

La Retriate Rd., Gonzales Village, Guapo, Trinidad, W.I.

Phone: (868) 648-0827/9

Guyana

Guyana Facility

2940 Plantations Friendship East Bank, Demerara, Guyana

Phone: (592) 683-3351